Manufacturing software development services

Manufacturing software development services

Production, quality and maintenance systems built by senior LATAM engineers who work your hours and know that the line stopping is the only metric that matters.

Applebees
KPMG
Mastercard
Microsoft
NetJets
Toyota
  • 15+
    years delivering software
  • 100+
    senior engineers across LATAM
  • 6-8h
    daily overlap with US teams
  • 6+
    Fortune 500 & global brands trust us
Who we are

Software that has to survive contact with the plant floor

Most manufacturing software projects do not fail on the application. They fail at the edge: a control system nobody wants to touch, a tag list that does not match the documentation, a network that was never meant to talk to anything above it.

FusionHit builds manufacturing systems with senior engineers across Latin America who have read from a historian, worked next to controls people and planned a cutover around a shutdown window. They work US Central and Eastern hours, so a question from the plant gets answered during the shift it came up in.

FusionHit engineer building a manufacturing system at a workstation \
WHAT WE BUILD

Manufacturing systems we build

The systems our clients bring us most often, each one built around the line, the data and the people who run it.

Production monitoring and OEE

Machine and line data turned into availability, performance and quality that the plant actually trusts and uses in the morning meeting.

Production planning and scheduling

Orders, capacity and changeovers, so a schedule survives the first thing that goes wrong on the shift.

Quality management

Inspections, non-conformances, corrective actions and the records an audit asks for, captured where the work happens.

Maintenance and asset management

Work orders, preventive schedules and history, plus condition data from the equipment that already produces it.

Traceability and genealogy

Lot and serial history from raw material to shipment, so a recall question takes minutes rather than a week.

Shop floor applications

Operator and supervisor screens built for gloves, glare and shift handover, not for a desk.

ERP and plant integrations

The layer between ERP, the plant systems and the equipment, so the office and the floor report the same numbers.

Manufacturing analytics

Yield, scrap, downtime and cost per unit, reported on plant data rather than on a monthly spreadsheet.

WHO WE BUILD FOR

The manufacturers we build software for

Different processes, different constraints. These are the ones our engineers already know how to work with.

Discrete manufacturers

Assembly and machining operations where routing, changeovers and traceability drive the system.

Process manufacturers

Batch and continuous production, where recipes, yields and quality records are the product.

Contract manufacturers

Multiple customers under one roof, each with their own specifications, reporting and confidentiality rules.

Industrial equipment makers

Software around the machines you sell, including what your customers see after installation.

Food and beverage

Lot traceability, shelf life and the records a recall or an inspection will ask for.

Regulated and safety critical

Aerospace, automotive and medical suppliers where the quality system decides what software is allowed to do.

THE PLANT FLOOR

What connecting to the plant floor actually involves

Every vendor says they integrate with existing equipment. Almost none of them says how. This is the part of the work that decides the timeline.

What it covers
What it takes
Reading from controls and SCADA

Getting machine state, counts and alarms out of PLCs and control systems without touching how they run.

An OPC UA server or an existing gateway, a tag list that matches reality, and a read-only path agreed with your controls team. Where the equipment is older, Modbus or a vendor driver through a gateway.

Historians and time series data

Process values you already collect, at the frequency the analysis actually needs.

Access to the historian, agreement on which tags matter, and a decision about what gets stored at full resolution and what gets aggregated.

Edge and connectivity

Getting data off the floor reliably when the network drops or a machine restarts.

An edge component that buffers locally and forwards with MQTT or an equivalent, so a network problem costs you a delay and not a gap in the record.

The OT and IT boundary

Keeping the plant network separated from everything above it.

Traffic in one direction wherever possible, a defined segment for the integration, and your controls and IT security people agreeing the design before anything is installed.

ERP and business systems

Orders, materials, labour and cost, so the floor and the office agree.

Master data agreement first. Most of the pain here is two systems disagreeing about what a part, a work order or a location is.

Deploying without stopping the line

Getting new software into production in a plant that runs.

Shadow running the new system beside the current process, a cutover placed in a planned window, and a tested way back if the shift does not go well.

Reading from controls and SCADA

What it covers

Getting machine state, counts and alarms out of PLCs and control systems without touching how they run.

What it takes

An OPC UA server or an existing gateway, a tag list that matches reality, and a read-only path agreed with your controls team. Where the equipment is older, Modbus or a vendor driver through a gateway.

Historians and time series data

What it covers

Process values you already collect, at the frequency the analysis actually needs.

What it takes

Access to the historian, agreement on which tags matter, and a decision about what gets stored at full resolution and what gets aggregated.

Edge and connectivity

What it covers

Getting data off the floor reliably when the network drops or a machine restarts.

What it takes

An edge component that buffers locally and forwards with MQTT or an equivalent, so a network problem costs you a delay and not a gap in the record.

The OT and IT boundary

What it covers

Keeping the plant network separated from everything above it.

What it takes

Traffic in one direction wherever possible, a defined segment for the integration, and your controls and IT security people agreeing the design before anything is installed.

ERP and business systems

What it covers

Orders, materials, labour and cost, so the floor and the office agree.

What it takes

Master data agreement first. Most of the pain here is two systems disagreeing about what a part, a work order or a location is.

Deploying without stopping the line

What it covers

Getting new software into production in a plant that runs.

What it takes

Shadow running the new system beside the current process, a cutover placed in a planned window, and a tested way back if the shift does not go well.

TIMELINE AND COST

What it takes to build, by system

Vendors answer this with 'it depends'. Here is what it depends on, by the kind of system, so you arrive at the first call knowing what to expect.

Typical timeline to first release
What drives the cost
Machine connectivity and data collection

2-4 months

Number and age of machines, whether a gateway or OPC UA server already exists, and how accurate the tag documentation turns out to be.

Production monitoring and OEE

3-5 months

Lines covered, how downtime reasons get captured, and how much history has to be loaded to make the numbers credible.

Quality management

4-7 months

Inspection plans, non-conformance and corrective action workflow, and the records your quality system has to keep.

Maintenance management

4-6 months

Asset hierarchy, preventive schedules, parts and stores, and whether condition data is part of scope.

Traceability and genealogy

5-9 months

Depth of the genealogy, scanning points on the line, and how much of the material history lives in paper today.

Planning and scheduling

6-10 months

Constraints modeled, changeover rules, ERP integration, and how much of the schedule is a person's judgement today.

Machine connectivity and data collection

Typical timeline to first release

2-4 months

What drives the cost

Number and age of machines, whether a gateway or OPC UA server already exists, and how accurate the tag documentation turns out to be.

Production monitoring and OEE

Typical timeline to first release

3-5 months

What drives the cost

Lines covered, how downtime reasons get captured, and how much history has to be loaded to make the numbers credible.

Quality management

Typical timeline to first release

4-7 months

What drives the cost

Inspection plans, non-conformance and corrective action workflow, and the records your quality system has to keep.

Maintenance management

Typical timeline to first release

4-6 months

What drives the cost

Asset hierarchy, preventive schedules, parts and stores, and whether condition data is part of scope.

Traceability and genealogy

Typical timeline to first release

5-9 months

What drives the cost

Depth of the genealogy, scanning points on the line, and how much of the material history lives in paper today.

Planning and scheduling

Typical timeline to first release

6-10 months

What drives the cost

Constraints modeled, changeover rules, ERP integration, and how much of the schedule is a person's judgement today.

Why FusionHit

Why manufacturers build with FusionHit

  • Senior engineers only, and you pick them

    Every engineer on your account is a vetted senior and you interview them before they start. The risk in plant software is a junior nobody told you about, not a border.


  • On your shift, not the next one

    Engineers on US Central and Eastern time, so a question from the plant or a problem after a cutover is handled during the same shift.


  • The floor is part of the scope

    Controls, historians, edge and the OT boundary are designed with your controls and IT people, rather than assumed to be somebody else's problem.


  • Your systems, your data

    Work happens in repositories and cloud accounts under your organization, with named engineers under your access policy and all intellectual property assigned to you.

FusionHit senior nearshore engineers working with a US client team

Tell us what the plant is still tracking on paper.

Talk to an expert, 30 minutes, no commitment.

Talk to an Expert
HOW WE ENGAGE

Three ways to work with us

Pick the model that fits how your team runs. Plenty of clients start with one and move to another as the roadmap grows.

Staff augmentation

Senior engineers added to your existing team, under your direction. Best when you have a technical lead and need capacity or a specific skill.

Dedicated development teams

A stable team that works only on your product, with a lead on our side. Best when you want a whole workstream owned without hiring a manager for it.

Software development outsourcing

A defined scope delivered end to end under our management, for a fixed price and date. Best when the scope is clear and you want one number and one date.

TECHNOLOGY EXPERTISE

Stacks our manufacturing teams work in

The technologies behind the plant and operations systems we build and maintain.

Backend

Frontend

Cloud and DevOps

Plant connectivity

MORE INDUSTRIES

Other industries we build for

The same engineering standards, applied to the rules each industry runs under.

Logistics

Systems that run around the clock, from warehouse to last mile.

Retail

Commerce and store platforms sized for a peak season before it arrives.

Fintech

Payments, lending, banking and wealth platforms built inside your compliance perimeter.

Healthcare

Clinical, patient and revenue systems built around HIPAA and the workflows clinicians use.

Insurance

Policy, quoting and claims platforms for carriers, MGAs and brokers.

SaaS

Multi-tenant products, platform rebuilds and the engineering behind a growing subscription business.

FAQ

FAQs about our manufacturing software development services

01

How much does manufacturing software development cost?

It depends on the system. Machine connectivity is a different project from planning and scheduling. The table on this page gives the ranges we see by system type, and after discovery you get a written scope with the cost by milestone. Senior LATAM rates typically run 30-50% below equivalent US rates.
02

How long does it take to build manufacturing software?

Typically 2-4 months for machine connectivity, 3-5 months for production monitoring, 4-7 months for quality management and 6-10 months for planning and scheduling. Discovery gives you the real number for your case.
03

Can you actually connect to our machines, or only to our ERP?

Both. We read machine state, counts and alarms through OPC UA or an existing gateway, and through Modbus or a vendor driver where the equipment is older. What decides the timeline is whether a tag list exists and matches reality, which we check in discovery rather than assuming.
04

Will you touch our control systems?

No. Integration is read-only from the control layer wherever it is technically possible, designed with your controls team, and the plant network stays segmented. Nothing we build changes how a machine runs.
05

How do you deploy without stopping production?

The new system runs in shadow beside the current process first, the cutover goes into a planned window, and there is a tested way back. Nothing goes live in the middle of a shift because a sprint ended.
06

Your engineers are not on site. How does that work for plant software?

Discovery includes time with the people who run the process, and the questions that need the floor get answered while your shift is running because our engineers work US Central and Eastern hours. When a visit is genuinely needed, LATAM is a same-day flight rather than a fourteen-hour one.
07

Can you handle our quality and traceability records?

Yes. Inspections, non-conformances, corrective actions and lot or serial genealogy are built so the record an audit or a recall asks for can be produced from the system rather than assembled by hand.
08

Can you integrate with our ERP?

Yes. The usual work is agreeing master data first, because most integration problems between the floor and the office are two systems disagreeing about what a part, a work order or a location is.
09

Who owns the code and the intellectual property?

You do. The work lives in repositories and cloud accounts under your organization, and the contract assigns all intellectual property to you from the first commit.
10

Do we hire your engineers or do you deliver the project?

Either. You can add senior engineers to your own team, have a dedicated team own the workstream with a lead on our side, or hand us a defined scope for a fixed price and date. The three models are linked above.

Ready to get the floor and the office working from the same numbers?

Tell us what the process looks like today and what the equipment can give you, and we will come back with a scope and a plan.