Manufacturing software development services
Production, quality and maintenance systems built by senior LATAM engineers who work your hours and know that the line stopping is the only metric that matters.






-
15+years delivering software
-
100+senior engineers across LATAM
-
6-8hdaily overlap with US teams
-
6+Fortune 500 & global brands trust us
Software that has to survive contact with the plant floor
Most manufacturing software projects do not fail on the application. They fail at the edge: a control system nobody wants to touch, a tag list that does not match the documentation, a network that was never meant to talk to anything above it.
FusionHit builds manufacturing systems with senior engineers across Latin America who have read from a historian, worked next to controls people and planned a cutover around a shutdown window. They work US Central and Eastern hours, so a question from the plant gets answered during the shift it came up in.
\ Manufacturing systems we build
The systems our clients bring us most often, each one built around the line, the data and the people who run it.
Production monitoring and OEE
Machine and line data turned into availability, performance and quality that the plant actually trusts and uses in the morning meeting.
Production planning and scheduling
Orders, capacity and changeovers, so a schedule survives the first thing that goes wrong on the shift.
Quality management
Inspections, non-conformances, corrective actions and the records an audit asks for, captured where the work happens.
Maintenance and asset management
Work orders, preventive schedules and history, plus condition data from the equipment that already produces it.
Traceability and genealogy
Lot and serial history from raw material to shipment, so a recall question takes minutes rather than a week.
Shop floor applications
Operator and supervisor screens built for gloves, glare and shift handover, not for a desk.
ERP and plant integrations
The layer between ERP, the plant systems and the equipment, so the office and the floor report the same numbers.
Manufacturing analytics
Yield, scrap, downtime and cost per unit, reported on plant data rather than on a monthly spreadsheet.
The manufacturers we build software for
Different processes, different constraints. These are the ones our engineers already know how to work with.
Discrete manufacturers
Assembly and machining operations where routing, changeovers and traceability drive the system.
Process manufacturers
Batch and continuous production, where recipes, yields and quality records are the product.
Contract manufacturers
Multiple customers under one roof, each with their own specifications, reporting and confidentiality rules.
Industrial equipment makers
Software around the machines you sell, including what your customers see after installation.
Food and beverage
Lot traceability, shelf life and the records a recall or an inspection will ask for.
Regulated and safety critical
Aerospace, automotive and medical suppliers where the quality system decides what software is allowed to do.
What connecting to the plant floor actually involves
Every vendor says they integrate with existing equipment. Almost none of them says how. This is the part of the work that decides the timeline.
Getting machine state, counts and alarms out of PLCs and control systems without touching how they run.
An OPC UA server or an existing gateway, a tag list that matches reality, and a read-only path agreed with your controls team. Where the equipment is older, Modbus or a vendor driver through a gateway.
Process values you already collect, at the frequency the analysis actually needs.
Access to the historian, agreement on which tags matter, and a decision about what gets stored at full resolution and what gets aggregated.
Getting data off the floor reliably when the network drops or a machine restarts.
An edge component that buffers locally and forwards with MQTT or an equivalent, so a network problem costs you a delay and not a gap in the record.
Keeping the plant network separated from everything above it.
Traffic in one direction wherever possible, a defined segment for the integration, and your controls and IT security people agreeing the design before anything is installed.
Orders, materials, labour and cost, so the floor and the office agree.
Master data agreement first. Most of the pain here is two systems disagreeing about what a part, a work order or a location is.
Getting new software into production in a plant that runs.
Shadow running the new system beside the current process, a cutover placed in a planned window, and a tested way back if the shift does not go well.
Reading from controls and SCADA
Getting machine state, counts and alarms out of PLCs and control systems without touching how they run.
An OPC UA server or an existing gateway, a tag list that matches reality, and a read-only path agreed with your controls team. Where the equipment is older, Modbus or a vendor driver through a gateway.
Historians and time series data
Process values you already collect, at the frequency the analysis actually needs.
Access to the historian, agreement on which tags matter, and a decision about what gets stored at full resolution and what gets aggregated.
Edge and connectivity
Getting data off the floor reliably when the network drops or a machine restarts.
An edge component that buffers locally and forwards with MQTT or an equivalent, so a network problem costs you a delay and not a gap in the record.
The OT and IT boundary
Keeping the plant network separated from everything above it.
Traffic in one direction wherever possible, a defined segment for the integration, and your controls and IT security people agreeing the design before anything is installed.
ERP and business systems
Orders, materials, labour and cost, so the floor and the office agree.
Master data agreement first. Most of the pain here is two systems disagreeing about what a part, a work order or a location is.
Deploying without stopping the line
Getting new software into production in a plant that runs.
Shadow running the new system beside the current process, a cutover placed in a planned window, and a tested way back if the shift does not go well.
How a manufacturing build runs
Discovery on the floor
How the process actually runs, what data the equipment can give, and the exceptions people work around today.
Architecture and integration design
Edge and data flow, the OT boundary, and where the new system sits against ERP and your plant systems.
Build
Sprints with a demo every week, in repositories under your organization.
Testing and acceptance
Automated tests, a shadow run against the current process, and acceptance by the operators and supervisors who will use it.
Cutover and support
A cutover placed in a planned window with a way back, then a support window written into the agreement.
What it takes to build, by system
Vendors answer this with 'it depends'. Here is what it depends on, by the kind of system, so you arrive at the first call knowing what to expect.
2-4 months
Number and age of machines, whether a gateway or OPC UA server already exists, and how accurate the tag documentation turns out to be.
3-5 months
Lines covered, how downtime reasons get captured, and how much history has to be loaded to make the numbers credible.
4-7 months
Inspection plans, non-conformance and corrective action workflow, and the records your quality system has to keep.
4-6 months
Asset hierarchy, preventive schedules, parts and stores, and whether condition data is part of scope.
5-9 months
Depth of the genealogy, scanning points on the line, and how much of the material history lives in paper today.
6-10 months
Constraints modeled, changeover rules, ERP integration, and how much of the schedule is a person's judgement today.
Machine connectivity and data collection
2-4 months
Number and age of machines, whether a gateway or OPC UA server already exists, and how accurate the tag documentation turns out to be.
Production monitoring and OEE
3-5 months
Lines covered, how downtime reasons get captured, and how much history has to be loaded to make the numbers credible.
Quality management
4-7 months
Inspection plans, non-conformance and corrective action workflow, and the records your quality system has to keep.
Maintenance management
4-6 months
Asset hierarchy, preventive schedules, parts and stores, and whether condition data is part of scope.
Traceability and genealogy
5-9 months
Depth of the genealogy, scanning points on the line, and how much of the material history lives in paper today.
Planning and scheduling
6-10 months
Constraints modeled, changeover rules, ERP integration, and how much of the schedule is a person's judgement today.
Why manufacturers build with FusionHit
-
Senior engineers only, and you pick them
Every engineer on your account is a vetted senior and you interview them before they start. The risk in plant software is a junior nobody told you about, not a border.
-
On your shift, not the next one
Engineers on US Central and Eastern time, so a question from the plant or a problem after a cutover is handled during the same shift.
-
The floor is part of the scope
Controls, historians, edge and the OT boundary are designed with your controls and IT people, rather than assumed to be somebody else's problem.
-
Your systems, your data
Work happens in repositories and cloud accounts under your organization, with named engineers under your access policy and all intellectual property assigned to you.


Tell us what the plant is still tracking on paper.
Talk to an expert, 30 minutes, no commitment.
Three ways to work with us
Pick the model that fits how your team runs. Plenty of clients start with one and move to another as the roadmap grows.
Staff augmentation
Senior engineers added to your existing team, under your direction. Best when you have a technical lead and need capacity or a specific skill.
Dedicated development teams
A stable team that works only on your product, with a lead on our side. Best when you want a whole workstream owned without hiring a manager for it.
Software development outsourcing
A defined scope delivered end to end under our management, for a fixed price and date. Best when the scope is clear and you want one number and one date.
Stacks our manufacturing teams work in
The technologies behind the plant and operations systems we build and maintain.
Other industries we build for
The same engineering standards, applied to the rules each industry runs under.
Logistics
Systems that run around the clock, from warehouse to last mile.
Retail
Commerce and store platforms sized for a peak season before it arrives.
Fintech
Payments, lending, banking and wealth platforms built inside your compliance perimeter.
Healthcare
Clinical, patient and revenue systems built around HIPAA and the workflows clinicians use.
Insurance
Policy, quoting and claims platforms for carriers, MGAs and brokers.
SaaS
Multi-tenant products, platform rebuilds and the engineering behind a growing subscription business.

